Design
Preparation of multidisciplinary design documentation at every stage of the process:
Corridor Study
Technical, Economic and Environmental Study
Programme Concept
Building Permit Design
Technical Design
Detailed Design
As-Built Documentation
years
in business
km
of roads designed
specialist design
departments
Corridor Study
Technical, Economic and Environmental Study
Programme Concept
Building Permit Design
Technical Design
Detailed Design
As-Built Documentation
Review of engineering solutions
Technical assessments
Cooperation with research and scientific institutions
Development of alternative and remedial solutions
Technical consulting and expert support
Multidisciplinary analysis of contractual requirements
Optimisation of design solutions
Tender bill of quantities
Value engineering
Discussion of the scope, project specifics and client requirements. Cost estimate and schedule.
Development of design alternatives, preparation of the Technical, Economic and Environmental Study, and recommendations.
Complete building permit documentation, including obtaining a Road Investment Permit (ZRID) or building permit.
Detailed construction documentation, cost estimates and tender materials.
On-site support, including clarification of the design documentation and resolution of technical issues.
Develop your skills on some of Poland’s largest infrastructure projects.
We prepare comprehensive design documentation for expressways and bridges — from concept development to detailed design. Join a team that combines experience, responsibility and a genuine impact on infrastructure development.
Our company was founded in June 1986 – at that time as Zakład projektowania Dróg i Mostów Complex Projekt Sp. z o.o. These 40 years have been a time of challenges and joys, as well as growth. We are delighted with the journey we have undertaken, our achievements and the wealth of experience we have gained. To everyone who has accompanied us throughout this time, we would like to express our heartfelt gratitude and thanks.
After around three years of construction, the project’s acceptance procedures are drawing to a close. Over 16 km of new expressway has been built, together with a network of adjacent roads and traveller service areas, including an impressively large buffer car park designed to handle freight traffic prior to customs checks at the existing border crossing. Photos taken a few days ago can be found in the projects section.
Although the handover procedure has not yet been formally completed, we are aware that we have completed the project we have been working on for the past three years or so. It was originally intended to take less time; however, problems with the environmental permit that the client was required to provide, as well as a change in government policy, extended our work by nearly two years. This has been a period of new experiences and a reassessment of our original assumptions regarding the appropriateness of using BIM in infrastructure projects.
Contact
We’d be happy to discuss the scope, timetable and how we can support your project – both during the tender stage and throughout its implementation.
Please provide basic information about the project, the scope of work and the current stage of the development. We will contact you to discuss possible support with the project, administrative matters or the tender process.
We’d like to get to know you – please tell us a bit about yourself.