About Company

About Company

Discover the expertise, values and people behind Complex Projekt.

<span>We design infrastructure</span> that will last for years

Experience embedded in Poland’s infrastructure

The history of Complex Projekt is not just about dates; it is also about places that have become an integral part of the Polish landscape. We started out in the era of analogue design, and today we carry out our projects using the latest digital tools. Our roots go back to 1986 – it was during this time that projects such as the Kraków Southern Bypass and the tunnel on the S-69 route shaped our DNA.

Our strength lies in our team of experienced designers, engineers and consultants, as well as the practical experience we have gained on large and complex projects — ranging from motorways and expressways to projects carried out in challenging terrain and geotechnical conditions.


Over 40 years of expertise, development and challenging projects

Complex Projekt has been growing since 1986. From the very beginning, we have focused on specialist knowledge, our own technical staff and modern tools to support the design process. Over time, we have gained experience on increasingly large-scale projects, establishing ourselves as a partner in complex infrastructure projects.

Selected milestones

Scroll down to explore the company’s history

1986

Establishment of Zakłady Projektowania dróg i mostów Complex Projekt Sp. z o.o.

1988

Launch of operations in the field of bridge construction.

Contributed to the development of the design for Poland’s first road tunnel through a mountain.

1989

An industry projects department is being set up, which will later become the infrastructure and environment studio

Contributed to the development of the design for Poland’s first road tunnel through a mountain.

1991

Hydroprojekt Katowice is taking on the Complex project, thereby expanding its activities to include land drainage projects.

1994

Implementation of the MOSS (MX Roads) tool environment on the Macrostation platform.

1995

The first project on so-called mining damage sites – the Piekary Śląskie Bypass

1998

The design of Poland’s first road tunnel in Laiki, 800 metres long.

1999

The first motorway design and the first set of documentation in English; the design work was supervised by auditors from Atkins

2000

Launch of a parallel tool platform – AutoCAD

2005

The dynamic growth of the bridge engineering department

2009

The largest project – 70 km of the A4 motorway between Tarnów and Rzeszów

2011

Expansion of business activities to include investor supervision

2012

The first project carried out under the Design & Build model – S-8

2014

A partnership in the Brazilian market with VLB Engenharia, which has resulted in the design of a bridge across the River Ingazeria.

2015

Launch of a parallel AutoCAD Civil 3D design platform.

2016

Our first comprehensive overseas project – the I-35 expressway for the Czech Public Roads Authority.

2017

Succession on the Board of Directors of Complex Projekt Sp. z o. o.

2018

The first project as part of the collaboration with Budimex S.A. under the Design&Build contract for the S-61 Stawiski–Szczuczym section.

2019

Preparation of the full design documentation for the 25 km stretch of the S-61 road between Suwałki and Budzisko

preparation of the detailed design and construction drawings within 8 months

2022

The first infrastructure project carried out using BIM technology

What sets us apart What sets us apart

What sets us apart

We are committed to transparent collaboration, practical solutions and quality that pays off for years to come.

Capital and schedule security

We understand that large-scale road and bridge projects are like operations on a living organism.

Cost optimisation through engineering

We strive to find cost-effective solutions. We develop these whilst respecting the preferences of the Main Contractor/Client.

Comprehensive approach (Design & Consult)

We manage the project through all its phases – from the programme concept, through the structural and detailed design, right through to the client’s supervision.

International experience

Our experience of international projects, as well as our collaboration with external auditors of recognised standing (e.g. Atkins), enables us to guarantee that the project will meet international standards.

A culture of knowledge

We combine the experience of the designers of the A1 and A4 motorways with the boldness of younger engineers.

Tools

We use advanced numerical software that enables us to model the behaviour of structures under extreme conditions (mining environments).

Iconic projects

We are delighted to have the opportunity to work on spectacular projects.


Quality that streamlines the way we work

We strive to provide our clients with high-quality solutions that develop capabilities and push the traditional boundaries of engineering

We view quality as a responsibility for the entire process — from the initial analyses to the final documentation. We ensure compliance with applicable regulations, technical expertise and collaboration standards, which enable us to deliver projects efficiently and predictably.

Our approach is based on:

maintaining regular contact with the client,

ensuring the completeness and accuracy of our work,

working with trusted partners,

and continuously improving our design processes.

Quality that streamlines the way we work
Quality is our way of working. We are aware that our solutions have a lasting impact on the environment in which we live.